Topic: | Re:Re:Re:Re:Re:Re:Re:CrossRail and Station Access | |
Posted by: | Libby Kemp | |
Date/Time: | 24/09/09 11:16:00 |
The reason Greenford does not currently run seven days and in the evenings is that NR require the tracks to run what is called a 'two track' ralway, to allow engineering works to be carried out on the other tracks. Long distance high speed trains take priority over local slow ones and therfore take up the track capacity. |