Topic: | Re:Re:Re:Re:CrossRail and Station Access | |
Posted by: | Chris Bell | |
Date/Time: | 23/09/09 22:03:00 |
I would not object too much even if the stations are specifically designed to be built and then extended later, rather than similar to the motorways which needed to be dug up and completely rebuilt (like the early M1) or slightly extended at greater than the original construction cost. I would like to see the Greenford line reach Ealing Broadway if it is shortened, but even if space is available for the track, moving to single track before West Ealing, followed by stops at West Ealing, Ealing Broadway, back to West Ealing, then back to twin track before the next train arrives, might take rather a long time and limit the number of trains possible. |