| Topic: | Re:Re:Re:Re:Re:Re:Re:Crossrail Could Be Delayed Until 2021 - BBC | |
| Posted by: | Philip Coe | |
| Date/Time: | 03/05/19 11:33:00 |
| Philipa I believe the total abortive costs came to £53M including £43M public figure. Seems an incredible figure when I gather works on site never actually started. |