| Topic: | Re:Re:Re:Re: Management and Target Setting | |
| Posted by: | Simon Hayes | |
| Date/Time: | 26/04/19 09:30:00 |
| Over-promising at the outset is a common problem, then a rapid reverse ferret when things go belly up. As you say these very technical projects are always likely to over-run. The Jubilee Line upgrade was beset with such issues, with the new signalling shorting out because it was incompatible with the older technology of the existing trains. As a result it went over time and over budget. |