Richard, this was posted by Chris Calvi-Freeman on BrentfordTW8.com: "30 March to 15 May 2009 Replacement of water mains in Windmill Road from its junction with A4 Great West Road to the junction with Murray Road. During this time Windmill Road will be made one-way northbound. Traffic will be able to enter Windmill Road from the A4 but all southbound traffic will be diverted via Little Ealing Lane, South Ealing Road and Ealing Road and A4. Any traffic exiting from the side roads into Windmill Road will have to turn north and follow the diversion. Minor changes will be made to the traffic signal timings to cater for the additional traffic that will be using Ealing Road. Waiting and loading restrictions will also be introduced alongside the works area to ensure the northbound traffic can flow unhindered." I have walked down Windmill Road several times this week and the work seems to be progressing quite well. |